Pillar 4
Protect assets during construction delay, storage, and shutdown
ANUBX delivers comprehensive asset preservation programs from construction through long-term shutdown. Our approach protects equipment readiness, reduces corrosion risk, and supports safer recommissioning—including short- and long-term internal preservation programs for fixed-roof and floating-roof aboveground storage tanks.
Construction & Pre-Commissioning Preservation
Protection plans for static and rotating equipment to maintain readiness through project delays and phased handover. For ASTs, this includes internal preservation planning for fixed-roof and floating-roof tanks awaiting commissioning.
Wet & Dry Lay-Up (Tanks, Pipelines & Critical Equipment)
Lay-up for tanks/pipelines and key assets: turbines, compressors, pumps, gearboxes, engines, generators, electrical motors, heat exchangers, air coolers, condensers, distillation columns, reactors, vessels/separators, heaters/fired heaters, boilers, dryers, and critical skids/packages—using sealing/isolation, inerting/blanketing, dehumidification, internal preservation, and monitoring. This includes short- and long-term internal preservation programs for fixed-roof and floating-roof ASTs.
Mothballing & Long-Term Shutdown Preservation
Long-duration preservation for rotating, static, and electrical systems with periodic verification, recommissioning readiness, and controlled reactivation guidance. AST scope includes preservation methodology for out-of-service tanks, delayed-start facilities, and shutdown storage assets.
Preservation Packaging for Storage & Transportation
Barrier/VCI packaging with moisture control and integrity sealing for machined parts, spare rotors, tube bundles, valves, instruments, and critical spares—including labeling and traceability.
Contact our team to discuss AST internal preservation, wet or dry lay-up, shutdown preservation, and packaging requirements.